State Road 329 to have restrictions near Logansport starting on or after April 7, 2025

Listen to this article

Last Updated on March 31, 2025 by Cass County Communication Network

CASS COUNTY, Ind. – Indiana Department of Transportation contractor E&B Paving LLC will have lane closures and then a full road closure to resurface State Road 329/Burlington Ave between State Road 25/U.S. 35/U.S. 24 and State Road 29 starting on or after Monday, April 7.

State Road 329 will first have lane closures with flaggers directing traffic for approximately five days starting on or after April 7 for deep patching. The road will then close for approximately seven days on or after Monday, April 14 for resurfacing. During the full closure, the official detour will follow State Road 25 and State Road 218.

This work is part of a larger contract to resurface State Road 29/State Road 218 between State Road 25/U.S. 35/U.S. 24 in Cass County and State Road 218 in Carroll County. This resurfacing will be a full depth reclamation where the entire asphalt pavement and a portion of the underlying materials are pulverized and blended to create a stabilized base course for a new surface layer. 

INDOT encourages drivers to consider safety for all by slowing down, using extra caution and driving distraction-free when travelling in and around all work zones.

SOURCE: News release from Indiana Department of Transportation

Cass County Online